On June 9, 2025, students majoring in Road and Bridge Engineering at the Mongolian University of Science and Technology (MUST) visited the construction site of the infrastructure project connecting Tolgoit Road with Ard Ayush Avenue. The field visit provided students with the opportunity to observe real-time construction work and engage directly with industry professionals.
As part of the field study, the students participated in the following activities:
Project Overview – Project engineers delivered a detailed presentation on the phases of implementation, road planning and design, and geotechnical investigations.
Site Walkthrough – Students observed the ongoing construction works, including earthworks and foundation structure assembly, gaining insight into day-to-day site operations.
Safety Briefing – A safety orientation was conducted, focusing on occupational health and safety procedures required on active construction sites.
Q&A Session – Students engaged in an open discussion with the engineers, asking questions and gaining a deeper understanding of the project's technical aspects.
This practical training aimed to bridge theoretical knowledge with real-world application, offering students a firsthand look at the professional environment they will enter after graduation. The visit inspired and motivated the students, giving them a clearer perspective on their future careers in the field of road and bridge engineering.