Within the framework of the action programme 2020-2024 "Local Endowment" of the Governor's Office of Umnugobi Province and the annual plan for the development of Umnugobi Province in 2022, according to the Road Designing Work Order dated 04.07.2022 No. ZT-39/2022, Dalanzadgad of Umnugobi Province 100 km road design from Bulgan-Mandal-Ovoo Soums to Ovorkhangai Province has been developed.
The newly designed road strip will be located in Dalanzadgad, Khanhongor and Bulgan soum of Umnugobi province, starting from the western part of the centre of Dalanzadgad soum, going northwest through the territory of Khanhongor soum, passing the centre of Bulgan soum and continuing about 17 km northeast of the centre of Bulgan soum, for a total of 100 km. The link road of Bulgan Sum is located in the direction of Bulgan Sum from the main road, while the link road of Dalanzadgad Sum is located in a separate area from the main road. Bayandalai - Dalanzadgad highway will be a link road to connect Dalanzadgad Sum airport highway.
The proposed road is a vertical axis road and is primarily intended for tourism. According to the study, there are tourist camps at 10 locations along the route, and the road will lead to natural parks such as Bayanzag and Hongor Dunes.