According to the order of the Deputy Prime Minister and the Minister of Economy and Development of Mongolia dated March 23, 2023, No. A/16, No. 230901068, and the geodesy, engineering, and geological measurement survey carried out in October 2023 based on the materials, the design of the road was developed.
The Metropolitan Policy Research and Analysis Center has estimated that the traffic volume from Zaisang Street to Hunnu Street-Amgalan railway crossing will increase to 15,750-17,000 vehicles after the implementation of the 4th Circle project of the capital. Also, according to this direction, the front part of the project to build the "New Ring Road" of the capital Ulaanbaatar, the design of the 35-km Tuul highway will be implemented, and it will be parallel to our planned road route, and it will be possible to connect it spatially through a link. It is planned in categories and has a total length of 2 lanes and 7.1 km of paved road.