Following the order of the capital governor No. A/523 dated 30 June 2021, the geodetic and geological survey was carried out in August 2021 in accordance with the task of developing the design of the highway from Sunjin Grand south through the Ger area to Sun Road in the 13th district of Bayanzurkh district.
In the task of road design development, road technical classification and road grade are given as "Auxiliary road". Therefore, in 2016, the newly approved ZZBNbD No. 22-004-2016 was designed in the category of "Urban Accumulating Streets" specified in section 10.3 of "Road Design".
1. Route: 1 lane 3.0 m wide from 0+000,000 to 0+234,333, 2 lanes 6 m wide from 0+260,298 to 0+509,772.
2. Route: 2 0+020,000 - 0+050,000 1 lane 8m wide for 1 direction, 0+050,000 - 0+245,118 1 lane 3.0m wide.
3. Pedestrian 0+006,340 - 0+144,898 1 lane 2m wide.